The OEM no longer supplies a critical part
Obsolete and discontinued spare parts, unacceptable lead times, legacy equipment and no practical replacement route.
I step in when engineering uncertainty is already turning into downtime, supplier dependency, rework, delayed commissioning or unnecessary manufacturing cost.
Obsolete and discontinued spare parts, unacceptable lead times, legacy equipment and no practical replacement route.
Recover geometry, fits, material requirements and manufacturing documentation from a sample and its operating context.
Rebuild reliable as-built technical documentation for maintenance, sourcing, modification and repeat manufacture.
Review specifications, interfaces, exclusions, documentation and acceptance criteria before contract commitment.
Turn a supplier demonstration into traceable evidence against measurable requirements before shipment or final payment.
Compare remaining function, obsolescence, maintainability, interfaces, downtime and capital implications.
Find cost locked into geometry, setups, tolerances, welding, machining, inspection and non-standard components.
Convert supplier-dependent knowledge into controlled specifications, drawings and verification requirements.