OEM part is obsolete or discontinued
Legacy equipment, unavailable spares, unacceptable lead time and no original drawing.
Mechanical engineer and Independent Technical Partner for expensive industrial decisions. I help owners, technical directors and chief engineers understand what will work, what may fail and what should be checked before money is committed to production, procurement or modernization.
Engineering practice since 2007. Based in Minsk, Belarus. Projects across Belarus and the CIS, remotely and on site when the task requires it.
Send an engineering problem See case studies
First 15-minute discussion is free. On-demand work from 3,000 BYN. Project work from 5,000 BYN.
A component is unavailable, discontinued or tied to an unacceptable OEM lead time. I help restore the engineering definition from samples and available records so the part can be evaluated for local manufacture.
When original design documentation is missing, I reconstruct geometry, interfaces and production requirements and turn the available evidence into 3D models, drawings and a manufacturable technical package.
I help structure the technical problem, compare design options, develop mechanical solutions and prepare documentation for prototypes, testing and production.
The goal is not simply to copy a foreign part. The goal is to restore the enterprise's ability to obtain, inspect and reproduce a technically suitable component without dependence on one external source.
Before an expensive purchase or payment, I can review specifications, supplier proposals, technical limitations, completeness, documentation and acceptance criteria from the customer's side.
I review geometry, materials, operations, assembly and documentation to find avoidable manufacturing complexity and make the design easier to produce, inspect and repeat.
I check three levels. Physics: will the solution work under the real loads, interfaces and operating conditions? Economics: what does the decision do to manufacturing cost, downtime, CAPEX, TCO, resource and dependence on suppliers? Execution: who can manufacture it, how will it be inspected and can the result be repeated.
I do not replace the customer's design office, chief mechanic, procurement team or technical director. My role is to create an independent engineering position, identify technical risks, compare options and help move the selected solution toward implementation.
A 900 VA equipment enclosure was redesigned around sheet-metal bending and simpler assembly. The project reduced the number of enclosure parts by approximately 25-40%, shortened the production cycle by about 15% and produced a calculated direct-cost reduction of up to 35%.
A critical screw pair had to be reconstructed without the original design documentation. Geometry, rotor profiles and production requirements were restored from the available physical and dimensional evidence. The target engineering cycle was 15 working days.
I participated as a technician-designer in the project team working on modernization of Zhodino CHP, including equipment associated with a 60 t/h steam boiler. The project materials report an economic effect of approximately USD 4.7 million.
The cost of a wrong technical decision is much higher than the cost of checking it. Typical situations include downtime risk, missing design documentation, failed localization, critical spare parts, supplier uncertainty, modernization, weak specifications, difficult manufacturability or acceptance before payment.
You only need routine drafting from a complete specification, a visualization without engineering work, or a task unrelated to industrial equipment and mechanical engineering. I focus on problems where engineering judgement changes risk, cost or the ability to manufacture and operate the result.
I started my engineering career in 2007 at the Beloozersk Energy Mechanical Plant within the Belenergo system, working on industrial and energy equipment. My early work included participation in the Zhodino CHP modernization project.
I later spent more than eight years as a mechanical design engineer in Minsk, working with industrial equipment, mechanical assemblies, sheet-metal structures, production drawings, localization and reverse engineering. In 2018, as part of the Sinetekhno team, I contributed mechanical components for robotic camera and operator equipment used at Minsk Arena during Junior Eurovision 2018.
Since 2023 I have developed an independent engineering practice focused on complex industrial problems from problem definition and reverse engineering through design documentation, production selection, technical verification and implementation support. I also write and speak about engineering, industrial economics, technology independence and the business consequences of technical decisions.
You do not need a perfect specification. A photo, drawing, equipment designation, supplier quotation, short description of the failure or a few sentences about what may happen if the decision is wrong are enough to start the first discussion.
Send the available material. The first 15-minute discussion is free and is used to determine whether I am a good fit and what source data would be needed for a responsible engineering conclusion.
LinkedIn · YouTube · Dzen · Media · Speaking · Podcasts and interviews
Start with the operational problem rather than a service label.
Legacy equipment, unavailable spares, unacceptable lead time and no original drawing.
Recover usable as-built technical information for maintenance, sourcing and modification.
Clarify scope, interfaces, exclusions, evidence and acceptance criteria before commitment.
Define measurable acceptance evidence before shipment or final payment.