SAMUTA ENGINEERING DATASET ยท EN

Surface Roughness Selection

Structured data for roughness parameters, functional reasons for selecting surface finish, process ranges and inspection context.

RU source page

Surface finish follows function

The dataset connects roughness requirements with friction, wear, sealing, fit, manufacturing process and inspection. Source standards require current verification where marked.

The Russian and English pages refer to the same dataset identity: https://pavel-samuta.github.io/engineering-data/surface-roughness-selection/#dataset.