SAMUTA ENGINEERING DATASET ยท EN

Design and Manufacturing Elements of Machine Parts

Structured data for chamfers, fillets, grooves, slots, threads, splines, knurling, center holes, tapers and sheet-metal elements.

RU source page

Recognize what the feature does

The dataset links common machine-part features to function and manufacturing context rather than treating geometry as an isolated shape.

The Russian and English pages refer to the same dataset identity: https://pavel-samuta.github.io/engineering-data/machine-part-design-elements/#dataset.