SAMUTA ENGINEERING DATASET ยท EN
Design Documentation Labor Intensity
Structured factors for estimating the labor intensity of design documentation: part and assembly complexity, novelty, drawing format, specifications, calculations, language and review.
Estimate the work before counting drawings
The dataset separates drafting volume from engineering complexity and records the factors that change effort before production documentation is released.
The Russian and English pages refer to the same dataset identity: https://pavel-samuta.github.io/engineering-data/kd-labor-intensity/#dataset.