SAMUTA ENGINEERING DATASET ยท EN

Coating Designations on Mechanical Drawings

Structured data for metallic, electroplated, paint and other coatings: designation logic, thickness, base preparation, properties, post-treatment and inspection.

RU source page

A coating is an engineering requirement

The dataset structures how coating material, process, thickness, properties, preparation and control are communicated on production drawings.

The Russian and English pages refer to the same dataset identity: https://pavel-samuta.github.io/engineering-data/coating-designations/#dataset.